logo

Mechanicsburg / Wertzville Rd. Area

Cumberland County

Exit 57 | PA 114 / Mechanicsburg
Exit 59 | East PA 581 To US 11 / I-83 / Camp Hill
Exit 61 | PA 944 / Wertzville Rd

To see a summary of the public input comments we received during Phase 1, click the blue circles on the map. To view additional information on the map, hover your cursor over the three squares on the top right corner of the map and select from the list of menu options.

After you have reviewed the Focus Area and Proposed Needs, provide your feedback at the bottom of the page and click “Submit”.

Proposed Needs

Highway Safety

Capacity issues at signalized intersections, ramp curvature and atypical interchange layout at PA 581 (Exit 59) result in highway safety implications.

Mobility

The existing mainline I-81 routinely experiences relatively high speeds in excess of the posted speed limit in the northbound direction between Exit 61 and Exit 65; and significant travel delay in the southbound directions, which contributes to operational and safety issues.

Land Use and Access

Commercial and residential development will continue to increase near Exits 57 and 61, resulting in traffic increases on area roads.  The construction of a new hospital and expansion of an existing hospital at Exit 61 will also increase traffic volumes on roads in proximity to the interchange.

Highway Infrastructure

The existing pavement and structures within the I-81 corridor were constructed in the 1960s and 1970s and are approaching the end of their serviceable life span. Gaps in ITS devices (CCTV and DMS) and antiquated existing equipment were identified near mile marker 58 NB.

Tell Us What You Think

Translate »